首页>>产品中心>>塑料模具>>洗浴器具

产品分类

注塑模具 水龙头模具

注塑模具 水龙头模具

分享:
0

产品详情

  

Product Detail

Quick Details

Place of Origin: Zhejiang, China (Mainland)

Product Material: P20H, 718H, 2316, Nak80, S136

Mold life: 30K, 50K, 100K

HRC: 32-48

Brand Name: none Product: bidets injection mould

Runner: hot or cold

Payments item: half and half

Model Number: EHMF Name: injection molded plastic parts manufacturers, bidets injection mould Software: Pro-E, UG, regular worker, CAD T1 time: 30days after drawing confirmed 
Shaping Mode: Plastic Injection Mould Other name: fittings molding , auto parts mould , plastic injection molding Mold base: LKM, ODM Guaranty: 1 year

 

Packaging Delivery

Packaging Details Wooden carton
Delivery Details 35-45 DAYS

 

injection molded plastic parts manufacturers, bidets injection mould

Product Description

Specifications of injection molded plastic parts manufacturers, bidet injection mould:

mould material 45#, P20, H13, 718, 2738, NAK80, S136 etc.
mould base LKM, HASCO etc.
Cavity Single/multi
Mould life P20: 300,000-500,000 shots    2316 718H: 500,000 shots     S136 H13: 700,000 shots
Design software UG, PROE, CAD etc.
Plastic material PP, PE, ABS, PC etc.
Delivery time 35-45 days
Specification According to client’s requirements

1. Samples/drawing&requirement from you

2. Mould design: we will communicate and exchange the opinion with you after you place order.

3. Material Purchase: Steel cutting and mould base tooling.

4. Assembling.

5. Inspection of mould: following and controlling the tooling processing.

6. Mould testing: We will inform you the date. Then will send the sample’s inspection report and injection parameters with the sample to you!

7. Your instruction&confirmation for shipment.

8. Ready-made mould before packing.

Package of injection molding:

1. Wooden carton,

2. shipping by sea, by load,

3. We also can produce any plastic parts for you. We have 25 different ton injection machines.

Pictures of injection molded plastic parts manufacturers, bidets mould:

 

 


 

 

Company Information

1. Office corner

2. Equipment

3. Working place

4. Package and delivering

5. Certification

FAQ

Why choose us?

Prompt response in 24 hours
Good Quality
Reasonable price
Stronger engineer team Support R&D
Good After-sale service

 

How about your payments item?
Payment Item: 50% deposit after confirming the drawings and 50% balance after confirming the samples (before delivery).

 

Delivering time?
Generally, T1 time is 30 days after drawings confirmed both side, then the samples approved, 5 days later it can be delivering.

 

Ability of producing?
We have all tooling machine for making molds. We can provide 30-50 sets of molds every month.

 

 

 

Welcome to visit us!